DSpace Repository

Execution of the topographic works and staking out of an industrial construction in Ghiroda, Timiş county [articol]

Show simple item record

dc.contributor.author Bârliba, Livia Luminiţa
dc.contributor.author Eleş, Gabriel
dc.contributor.author Bârliba, Costel
dc.contributor.author Bârliba, Florin Cristian
dc.date.accessioned 2022-01-18T09:04:07Z
dc.date.available 2022-01-18T09:04:07Z
dc.date.issued 2020
dc.identifier.citation Bârliba, Livia Luminiţa. Execution of the topographic works and staking out of an industrial construction in Ghiroda, Timiş county. Timişoara: Editura Politehnica, 2020 en_US
dc.identifier.uri http://primo.upt.ro:1701/primo-explore/search?query=any,contains,Execution%20of%20the%20topographic%20works%20and%20staking%20out%20of%20an%20industrial%20construction%20in%20Ghiroda,%20Timi%C5%9F%20county&tab=default_tab&search_scope=40TUT&vid=40TUT_V1&lang=ro_RO&offset=0 Link Primo
dc.description.abstract The paper aimed to present a model for the elaboration and development of a follow-up work for surface constructions, in order to build a construction with a height regime on the ground floor. This project was approved by the Ghiroda Commune City Hall. Due to the small tolerances allowed by the builder in tracing the axles and bolts, it was absolutely necessary to contract a surveying company to perform the land identification, and then to place the future construction according to the distances approved by the Urbanism Certificate and Construction Authorization. This type of work requires a large volume of work both in the preliminary phase and in the execution phase which requires the measurement of large areas of land. In order to identify and delimit the properties, stake out the construction elements and follow the execution, it is imperative that the surveyor is well informed about the data and plans already existing in the OCPI archives, which must coincide with those resulting from field measurements. en_US
dc.language.iso en en_US
dc.publisher Timişoara: Editura Politehnica en_US
dc.relation.ispartofseries Buletinul ştiinţific al Universităţii „Politehnica” din Timişoara, România. Seria hidrotehnică, Vol. 65(79), issue 1 (2020), p. 53-57
dc.subject GPS en_US
dc.subject Staking en_US
dc.title Execution of the topographic works and staking out of an industrial construction in Ghiroda, Timiş county [articol] en_US
dc.type Article en_US


Files in this item

This item appears in the following Collection(s)

Show simple item record

Search DSpace


Advanced Search

Browse

My Account