Utilizaţi acest identificator pentru a cita sau a face link la acest document: https://dspace.upt.ro/xmlui/handle/123456789/4244
Titlu: Topographic works executed for the railway modernization on the Ploiești-Focșani sector [articol]
Autori: Bârliba, Livia Luminiţa
Eleş, Gabriel
Bârliba, Costel
Dragomir, Lucian
Bârliba, Florin Cristian
Subiecte: Topographic survey
Railway modernization
Data publicării: 2020
Editura: Timişoara: Editura Politehnica
Citare: Bârliba, Livia Luminiţa. Topographic works executed for the railway modernization on the Ploiești-Focșani sector. În: Buletinul ştiinţific al Universităţii „Politehnica” din Timişoara, România. Seria hidrotehnică, Vol. 65(79), issue 1 (2020), p. 29-34. Timişoara: Editura Politehnica, 2020
Serie/Nr. raport: Buletinul ştiinţific al Universităţii „Politehnica” din Timişoara, România. Seria hidrotehnică, Vol. 65(79), issue 1 (2020), p. 29-34
Abstract: The work aimed to create a geodetic network through GPS measurements, for the modernization of the railway line on the Ploiești-Focșani route. GPS techniques are used to establish primary control and mapping of railway lines. The operational and procedural specifications for the performance of GPS technologies depend on the accuracy required for a particular project or map. In order to carry out these projects in the most cost-effective way, the necessary criteria must be ensured, such as accuracy, detailed analysis of the planning phase, the latter being essential. The measurements are carried out in the field, in order to obtain plans and maps, or for special purposes, such as the modernization of the railways. The topographic elements that are measured consist of angles (horizontal and vertical) and distances (inclined, horizontal and vertical). The results of the measurements are downloaded with special programs, usually drawing on the field at the same time sketches and descriptions of the topographic points. Performing calculations in the office consists in systematizing and processing the numerical results of field measurements and bringing them in a form as simple and suitable as possible to be used / performed with the help of the computer and last but not least the complex AutoCAD program together with TOPO LT.
URI: http://primo.upt.ro:1701/primo-explore/search?query=any,contains,Topographic%20works%20executed%20for%20the%20railway%20modernization%20on%20the%20Ploie%C8%99ti-Foc%C8%99ani%20sector&tab=default_tab&search_scope=40TUT&vid=40TUT_V1&lang=ro_RO&offset=0 Link Primo
Colecţia:Articole științifice/Scientific articles

Fişierele documentului:
Fişier Descriere MărimeFormat 
BUPT_ART_Barliba_f.pdf1.25 MBAdobe PDFVizualizare/Deschidere


Documentele din DSpace sunt protejate de legea dreptului de autor, cu toate drepturile rezervate, mai puţin cele indicate în mod explicit.