Abstract:
The case in study is the rehabilitation of a small-scale treatment plant with a maximum capacity of 19.44 m3/day, which did not reach the parameters (NTPA001) in commissioning. Small-scale treatment plants have certain particularities mainly due to small dimensions of pipelines and equipment. Another particular aspect relates to the advanced treatment of domestic wastewaters from industrial objectives and office buildings, which are characterized by different concentrations of pollutants compared to those proposed by the normative for domestic wastewater.